SAFE WORK PROCEDURES:

Please note the specific topic below and then request this in the “message” box on the contact page. Be sure to click the box for Safe Work Procedures.

TOPIC SAFE WORK PROCEDURES (SWP) SECTION AND PAGE #
Accidents, Reporting/Checklist SWP-03 – page 19
Air Kill Switch, checking SWP-03 – page 1
Anything w wheels, loading/securing SWP-07 – page 1-2
Anything w wheels, unloading SWP-07 – page 3-4
Barrels, lifting SWP-07 – page 5-6
Booster,cables,using SWP-03 – page 2
BOP’S, lifting from slant well SWP-07 – page 7-8
BOP’s loading and unloading SWP-07 – page 9-10
BOP’s setting on slant wells SWP-07 – page 11-12
Catwalks, transporting SWP-09 – page 1
Catwalks, loading/unloading SWP-07 – page 13-14
Cell phone, usage SWP-03 – page 3
Cement blocks, lifting SWP-07 – page 15-16
Chain, inspecting/using SWP-08 – page 1-2
Climbing a fixed ladder w/SLR SWP-02 – page 4-6
Climbing and working on the rig with an SRL SWP-02 – page 7-10
Climbing with a vertical lifeline, automatic fall arrestor SWP-02 – page 11-15
Climbing without a self-retracting life line SWP-02 – page 16-19
Coil tubing spool, loading SWP-07 – page 18-19
Coil tubing spool, unloading SWP-07 – page 20
Daily logs (hours of service) SWP-03 – page 4-5
Derrik, lifting off service rig SWP-07 – page 30-31
Differential locks SWP-03 – page 6
Double line winching SWP-11 – page 1-3
Driving, certain weather conditions SWP-03 – page 7-9
Driving out of the shop SWP-03 – page 10
Equipment, adding fluids, servicing SWP-03 – page 11
Equipment Certifications SWP-07 – page 17
ESP pump, lifting to well head for rigging SWP-07 – page 21-22
Fifth wheel, hooking SWP-12 – page 1
Fifth wheel, pre-trip inspection SWP-12 – page 2
Fifth wheel, unhooking SWP-12 – page 3
Fire extinguisher, care SWP-02 – page 1-2
Fire extinguisher, operating SWP-02 – page 3
H2S monitors, using SWP-01 – page 7
Hammers, using SWP-04 – page 1
HED pumps, lifting/laying SWP-07 – page 23-24
Horse heads, lifting SWP 07 – page 25-26
Idling the engine SWP-03 – page 12
Injectors, lifting out of a Derrik SWP-07 – page 27
Junk Baskets SWP-07 – page 28-29
Landing gear, lifting/lowering SWP-12 – page 4
Lifting and carrying, manual SWP-06- page 1-2
Light towers, loading, unloading SWP-07 – page 32-33
Load binders, using SWP-09 – page 2-3
Loaders, working with/near SWP-05 – page 1-2
Loading and Unloading a vehicle on a trailer SWP-09 – page 4
Loads, inspecting SWP-09 – page 5
Loads, securing SWP-09 – page 6-7
Loads, working on or around SWP-09 – page 8-9
Locations, working/driving SWP-03 – page 13-14
Locking out SWP-03 – page 22
Man basket, hoisting personnel SWP-07 – page 34-35
Matting, loading/unloading SWP-07 – page 36-37
Multi-picker lift SWP-07 – page 38-39
Permits, measuring loads SWP-09 – page 10
Picker inspection/logbook, completing SWP-07 – page 40
Pipe, Loading on trailer SWP-07 – page 44-45
Pipe, securing on a trailer SWP-09 – page 11
Pipe, unloading off trailer SWP-07 – page 46-47
Power hand tools, using SWP-04 – page 2
Power lines, working around SWP-10 – page 1-5
Power swivel, lifting out of a Derrik SWP-07 – page 44-45
PPE, inspection SWP-01 – page 8-9
Pre-trip inspection, completing SWP-03 – page 15
Pump, unloading/spotting SWP-07 – page 46-47
Refueling SWP-03 – page 48-49
Reversing SWP-03 – page 24-25
Rigging out SWP-07 – page 26
Rigging up SWP-07 – page 41-42
Rigging, inspecting-general SWP-08 – page 43
Roadside breakdown SWP-03 – page 3-6
Rods, lifting/loading SWP-07 – page 27
Shutting down a truck SWP-03 – page 28
Signalers/guides/spotters SWP-01 – page 2-5
Skids, loading/unloading SWP-07 – page 52-53
Skids, securing a picker loaded skid SWP-09 – page 12
Skids, securing a winch loaded skid SWP-09 – page 13
Skids, unloading winch loaded skid SWP-11 – page 4-5
Slings, nylon-inspecting/using SWP-08 – page 7
Spreader bar, using SWP-07 – page 54-55
Taglines, using SWP-08 – page 8
Three point contact SWP-01 – page 6
Tire chains, installing/removing SWP-03 – page 16-17
Tires, changing SWP-03 – page 20
Tongs, loading/unloading/spotting SWP-07 – page 56-57
Tongs, spotting tongs on the rig floor SWP-07 – page 58
Towing, getting towed SWP-03 – page 18
Trailer, lifting off ground with a winch SWP-11 – page 8
Trailer, setting front off ground with winch SWP-11 – page 9
Well head, lifting/installing SWP-07 – page 59-60
Wide loads, hauling SWP-09 – page 14-17
Winch lines, putting away/pulling out SWP-11 – page 10
Winching, general SWP-11 – page 11
Wire line sheave, lifting SWP-07 – page 61-62
Working on the structure from another secondary platform SWP-02 – page 23-26
Working with a horizontal lifeline SWP-02 – page 20-22